| 1 | Xinyi Eastern Extension Enters the Final Countdown – Mayor Chiang Emphasizes Safety, Quality, and Transportation Efficiency | 2025-10-13 |
| 2 | Moving into the Final Stretch Before Opening for Operations: Xinyi Eastern Extension Late Night Train Dynamic Testing Footage Released | 2025-10-03 |
| 3 | Call for Submissions for Public Art at Ventilation Shaft X, Kalah Station, Wanda Line | 2025-08-19 |
| 4 | Xinyi Eastern Extension Construction Progress Reaches 85%: A Sneak Peek into the E&M System Installation | 2025-06-23 |
| 5 | Taipei Twin Towers C1/D1 Steel Structure Hoisted to the 19th Floor: Growth Diary Part 2 Revealed | 2025-05-28 |
| 6 | Mayor Chiang Presides Over Groundbreaking Ceremony for the Final Mile of the Circular Line North Section | 2025-04-25 |
| 7 | Mayor Chiang Presides Over Groundbreaking Ceremony for Wenshan to Dapinglin Section of the Circular Line South Section | 2025-04-10 |
| 8 | Mayor Chiang Presides Over the Groundbreaking Ceremony for the Shilin Section of Circular Line North Section | 2025-04-02 |
| 9 | Mayor Chiang Presides Over the Groundbreaking Ceremony for the Xinyi-Wenshan Section of Circular Line East Section | 2025-01-14 |
| 10 | Circular Line Phase I Wins Public Art Excellence Award | 2024-12-18 |
| 11 | Taipei City Mayor Chiang and New Taipei City Mayor Hou Jointly Unveil the MRT Wanda Line First Train at Jincheng Depot | 2024-11-19 |
| 12 | Mayor Chiang Inspects Circular Line South Section and Announces Commencement of Taipei MRT 6 Lines Construction Plan 2.0 | 2024-11-06 |
| 13 | Xinyi Eastern Extension Tail Track Video Revealed | 2024-10-22 |
| 14 | Wanda Line Phase II Scheduled to Be Completed in 2031: First Images of Shulin Elevated Section Construction Released | 2024-08-14 |
| 15 | Mayor Chiang Wan-an Presides Over Taipei City Section Tunnel Breakthrough Ceremony | 2024-07-16 |
| 16 | Taipei Twin Towers C1/D1 Growth Diary Preview | 2024-05-29 |
| 17 | Groundbreaking Ceremony for Wanda Line Phase II Tucheng Section | 2024-04-17 |
| 18 | Mayor Chiang Wan-an Presides Over the Groundbreaking Ceremony for MRT Circular Line North Section, Shezi Section | 2024-03-28 |
| 19 | MRT Wanda Line Construction Once Again Wins Recognition of Engineering Oscar Award | 2024-02-20 |
| 20 | Wanda Line Phase II Tucheng Section Construction Contract Signed on January 9 | 2024-01-19 |